You don't have javascript enabled. Good luck with that.
Pencarian
Atasi Genagan di Jalan Patra, Saluran di Normalisasi

Channels Normalization on Jalan Patra and Mangga I Reaches 55 Percent

Until now it has reached 55 percent ongoing and is targeted to be complete on October 15

The water channels normalization work on Jalan Patra and Jalan Mangga I, Duri Kepa, Kebon Jeruk, West Jakarta has reached 55 percent.

West Jakarta Water Resources (SDA) Sub-agency's Development and Drainage Improvement Division Head Imam Prasetyo said it had been ongoing since October 22.

Rawa Lindung Reservoir Dredged from Waste

He explained, the channel normalization on Jalan Patra was up to 325 meters length with 150 centimeters depth and width. Then on Jalan Mangga I, it was done up to 145 meters with 80 centimeters width and depth.

"Until now it has reached 55 percent ongoing and is targeted to be complete on October 15," he said, Wednesday (11/11).

It was done to maximize water holding capacity and to smoothen water flow into retention pond or locally known as olakan towards Sekretaris River when rain poured.

"By so we can avoid puddles on Jalan Patra, Jalan Asem, Jalan Mangga and its surroudings," he closed.

Linked News
Popular News indeks
  1. Attending Betawi Eid 2026, Pram Encourages Strengthening Cultural Values

    access_time11-04-2026 remove_red_eye1103 personFolmer
  2. Low Emission Zones: Jakarta’s Concrete Step to Curb Air Pollution

    access_time13-04-2026 remove_red_eye1048 personAldi Geri Lumban Tobing
  3. Jakpro Promotes Integration Between JIS and KRL Station

    access_time10-04-2026 remove_red_eye879 personAldi Geri Lumban Tobing
  4. Cilandak Health Center Maintains Optimal Services

    access_time10-04-2026 remove_red_eye852 personTiyo Surya Sakti
  5. Pademangan Health Center Promotes 3M Plus to Prevent Dengue Fever

    access_time14-04-2026 remove_red_eye755 personAnita Karyati