You don't have javascript enabled. Good luck with that.
Pencarian
Atasi Genagan di Jalan Patra, Saluran di Normalisasi
.
photo Rudi Hermawan - Beritajakarta.id

Channels Normalization on Jalan Patra and Mangga I Reaches 55 Percent

Until now it has reached 55 percent ongoing and is targeted to be complete on October 15

The water channels normalization work on Jalan Patra and Jalan Mangga I, Duri Kepa, Kebon Jeruk, West Jakarta has reached 55 percent.

West Jakarta Water Resources (SDA) Sub-agency's Development and Drainage Improvement Division Head Imam Prasetyo said it had been ongoing since October 22.

Rawa Lindung Reservoir Dredged from Waste

He explained, the channel normalization on Jalan Patra was up to 325 meters length with 150 centimeters depth and width. Then on Jalan Mangga I, it was done up to 145 meters with 80 centimeters width and depth.

"Until now it has reached 55 percent ongoing and is targeted to be complete on October 15," he said, Wednesday (11/11).

It was done to maximize water holding capacity and to smoothen water flow into retention pond or locally known as olakan towards Sekretaris River when rain poured.

"By so we can avoid puddles on Jalan Patra, Jalan Asem, Jalan Mangga and its surroudings," he closed.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1040 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye907 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye549 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye447 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye381 personAldi Geri Lumban Tobing